Prep Planner
Enter your garage and tick the problems you see to get grinding and repair hours and days of prep.

How Long Is the Prep? Prep Planner
The garage
What is wrong with the floor
Saved. It will travel with your request below.
Grinding takes the area divided by 150 square feet an hour with one machine. Each problem you tick adds hours for every 100 square feet: cracks 0.75, oil stains 0.5, old coating or paint 1.0, pits or flaking 0.5 and low spots 0.75. The total hours is grinding plus the repair hours. Days on site is the total divided by 16 (two people working 8 hours), rounded up. These are planning rates for a crew with the right machines, and a real slab can be faster or slower, so we confirm the plan after we see the floor.
What the numbers mean
- Grinding hoursThe time for the diamond grinder across the whole floor.
- Repair hoursTime for each problem you ticked.
- DaysHow many days of prep for a crew of two.
About this tool
Are these exact?
No. They are planning rates. A hard slab or deep problems take longer, and we confirm after seeing the floor.
Does prep add to the coating time?
Prep often takes a day, then coating takes one or two more, depending on the system.
Can I save my result?
Yes. Send it to the form and it travels with your request.
When the numbers say it is time
Plate B01PrepDiamond Grinding and Surface PrepThe step that decides whether a coating lasts: diamond grinding opens the slab so the coating can grip it.See the details
Plate B03PrepGarage Floor Crack RepairCracks filled, bonded and ground flush, so they do not telegraph through the new coating.See the details
Plate B07PrepOil Stain and Grease RemovalOil, grease and brake fluid drawn out of the slab, so the new coating bonds to clean concrete.See the details Want us to check the numbers?
These tools give you a first look. Call or send the form and we will confirm everything on your own floor.